So I am starting my 8020 frame jig.
I will connect the 160x80 to the 80x80 tomorrow by drilling and tapping the holes.
Then start the head tube part after.
Any suggestions?
Want the center of the BB to be the pivot point.
The head tube will pivot at the bottom of the head tube.
The axle will be something like 44 bikes.
It will be a copy a lot of what has been done already.