The next day the builder drove from Elgin to Nottingham, where I lived. This involved a round trip of 908 miles. He cleaned the bottom bracket and, as he could see that I was interested, gave me a tutorial about this. When he was satisfied that everything was within my abilities to cope, he drove back to Elgin, still apologising for omitting to finish that detail of the frame.
Charles Ralph (Alves)?