Drilling has started
Drilling has started.jpg
Drilling has started
Drilling has started.jpg
A few more pics. Some progress
Bearing for the head tube angle
Adjuster bearing.jpg
Back of plate with the pins and holes drilled.
HT Backplate back.jpg
Front of HT plate. Bearing stud installed and holes drilled and counter sunk
HT Backplate front.jpg
A little progress. Finished the slot for the bolt to adjust head sube angle and added a pointer that will reference the degrees that will be machined and laser etched in the back plate.
Pointer.jpg
Headtube plate.jpg
Laser etched degree scale AF7F7A7C-C233-4484-807D-025DA9DE188E.jpeg
Bookmarks