We are less than two weeks into our renovation project. I already have:

  • Rational light switches and outlets where there used to be dumbassery;
  • An entry hall where there used to be a closet;
  • Two clerestory windows where there used to be sliding doors;
  • A 10' long kitchen window where there used to be a wall full of ugly;
  • The first coat of paint in our loft.

At this rate, the loft & second floor will be done - finished - within two weeks.
While I may be camping right now, the whole project is running well ahead of schedule.

  1. The loft & second floor should be done by Monday, not next Friday;
  2. The kitchen cabinets arrive Tuesday; and
  3. It looks like this today: