Well sort of. I'm about half way through two frames (touring, filleted with a lot of braze ons) and have posted onto my Flicker site. I won't bore you with photos here but do ask that if any of you happen to check the album out and have a wish to see specific details please let me know. As I go through #2's build I'll shoot what details I get asked for.

A side note is that my brain light build went off today during the set up for #2. I use a HJ universal jig and always had a challenge matching the head tube's top with the jig's top edge. As some of you might know there is no direct measurement design or connection between the top of the HT holder and the jig other then the holder's extension arm at it's bottom. I figured out a way to transfer the jig's top edge to the in place tubes. My solution is around shot #65.

https://www.flickr.com/photos/731955...57658194060433

Many thanks, Andy.